Sign In | Join Free | My himfr.com
Home > Off Grid Wind Turbine >

Three Phase Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply

    Buy cheap Three Phase Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply from wholesalers
     
    Buy cheap Three Phase Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply from wholesalers
    • Buy cheap Three Phase Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply from wholesalers

    Three Phase Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply

    Ask Lasest Price
    Brand Name : HYE
    Model Number : HY--600
    Certification : CE,UL, ISO9001
    Price : Negotiable
    Payment Terms : L/C, D/A, D/P, T/T, Western Union
    Supply Ability : 3000pcs/month
    Delivery Time : 3-5 working days
    • Product Details
    • Company Profile

    Three Phase Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply

    Three Phase AC Stainless Steel Rotor Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply​


    Description For Off Grid System Use:


    Wind Power Off Grid System is a stand alone power system. The energy produced by the wind turbine through the charge controller to make the 3 phase AC into DC, then store the power into the battery bank. A inverter which connected into the battery bank change the DC power into the AC power then transmit the electricity to the house equipments .


    Wind Off Grid Power System Include:


    1. Smart Small Wind Turbine
    2. Hybrid MPPT Controller
    3. Energy Storage --- maintenance free AGM gel deep cycled battery
    4. Inverter
    5. 6M/9M Guyed Tower

    Wind Generator Technical Parameters


    400W-1000W

    Rated Output400W600W1000W
    Peak Output500W750W1200W
    Rated Voltage(V)DC24DC24DC24
    Start-up Speed2m/s or 4.5mph2m/s or 4.5mph2.5m/s or 5.6mph
    Cut-in Speed2.5m/s or 5.6mph2.5m/s or 5.6mph3m/s or 6.7mph
    Rated Wind speed(m/s)12m/s or 26.8 mph12m/s or 26.8 mph12m/s or 26.8 mph
    System average Cp.≥0.36≥0.36≥0.36
    Rotor Diameter(m)1.55M1.75M1.96M
    Carton NW/GW (KG)22/25KG25/28KG28/32KG
    Carton Measurement118 X 46 X 26CM125 X 52 X 26CM147 X 52 X 26CM

    1500W-3000W

    Rated Output1500W3000W
    Peak Output1800w3500W
    Rated Voltage(V)off-grid DC48off-grid DC48
    Start-up Speed2m/s or 4.5mph2m/s or 4.5mph
    Cut-in Speed2.5m/s or 5.6mph2.5m/s or 5.6mph
    Rated Wind speed(m/s)12m/s or 26.8 mph12m/s or 26.8 mph
    System average Cp.0.38≥0.36
    Over-speed ControlElectromagnetic & blade aerodynamic brakingElectromagnetic & blade aerodynamic braking
    Rotor Diameter(m)2.05m3.05m
    Blade Materialreinforced nylon glass-fiberreinforced nylon glass-fiber
    Generator Type3-phase with permanent Neodymium Magnet3-phase with permanent Neodymium Magnet
    Carton NW/GW (KG)36/43KG70/84KG
    Carton Measurement112X 70X 30CM197 X 76.5 X 34CM

    Installation Guyed Tower Advise:


    Wind TurbineHY400/600/1000/1500HY2000/3000
    Tower Height(m)6969
    Pole Diameter(mm)φ76φ114
    Thickness(mm)3.54.0
    Length and Quantity of each rod3m(total 2 sections)3m total 3 sections)3m(total 2 sections)3m(total 3 sections)
    Wire rope Diameter(mm)φ10.0φ12.0
    Basic TypesConcrete /angle steel anchor foundation
    (HY1500 has concrete foundation only)
    Concrete foundation

    Remark: if tower need to be moved frequently or foundation soil is cement, you can fix the guyed tower with nail and angle steel anchor structure according to requirement, no need concrete pouring (for HY400/600/1000 wind turbine only).


    F&A


    Q1:Can you provide complete power system or only wind turbine?

    Yes, we can supply not only the wind turbine but also all the parts of the system


    Q2:Can you design the power system ?

    Yes, we have worked in wind power field for over 16years, we can give you professorial technical advice and according to your request to design the power system for you.


    Q3: Is our wind big enough for it?

    HYE wind turbine starts up at 2m/s. For the area whose average yearly wind speed over 2m/s, you can use it.


    Q4: I dont know the wind speed of my area?

    Send us email, we can help you to check.


    Q5: Delivery time?

    Sample order for 10 days; Bulk order for 25days


    Q6:How about the shipping?

    Our Packing of the wind turbine usually in one carton, it can be ship by express or by sea.


    Quality Three Phase Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Guangzhou HY Energy Technology Limited Corp.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)